Estimating 9 min read

Construction Estimates: Types and What Wins

Learn the different types of construction estimates, what to include in each one, and how contractors can present estimates that win more jobs.

By EstimationPro Team
Reviewed by construction professionals

Every contractor knows this feeling: you spend two hours putting together a detailed estimate, email it over, and never hear back. Meanwhile, the guy down the street sent a one-page number on a napkin and got the job. Or worse, you lowball a bid because you rushed through it, win the job, and lose money on every phase.

The estimate is where the job is won or lost. It sets the price, defines the scope, and tells the homeowner whether you’re a professional or just another guy with a truck. Getting it right means getting paid what you’re worth. Getting it wrong means working for free or not working at all.

Try EstimationPro free to build detailed, professional estimates in minutes instead of hours.

Quick Answer: What Is a Construction Estimate?

A construction estimate is a detailed projection of all costs required to complete a project, including materials, labor, equipment, permits, overhead, and profit. It serves as both an internal planning tool for the contractor and a pricing document for the client. A strong estimate protects your margins, sets clear expectations, and gives the homeowner confidence that you know what you’re doing.

Types of Construction Estimates

Not every project needs the same level of detail. Here’s how different estimate types compare and when to use each one.

Estimate TypeDetail LevelAccuracyBest ForTime to Prepare
Ballpark / Rough Order of MagnitudeVery low+/- 30-50%Initial phone calls, feasibility5-15 minutes
Square Foot / Unit PriceLow-medium+/- 15-25%Comparing scope options, early budgeting15-30 minutes
Detailed Line-ItemHigh+/- 5-10%Final pricing, signed contracts1-4 hours
Lump Sum / Fixed PriceHighFixedClear scope, defined timeline2-4 hours
Time and Materials (T&M)VariesActual cost + markupRepair work, unknowns, small jobs15-30 minutes

Ballpark Estimates

A ballpark estimate gives the client a general price range before you invest hours in detailed takeoffs. You might say, “A mid-range kitchen remodel typically runs $30,000 to $80,000 depending on scope.” This sets expectations early and filters out clients who have a $5,000 budget for a $50,000 project.

When to use it: Initial consultations, phone inquiries, “just wondering what it might cost” conversations.

Pro tip: Always give a range, never a single number. A single number becomes an anchor that’s almost impossible to move up later.

Square Foot / Unit Price Estimates

These estimates use a per-unit rate to calculate totals. For example, a bathroom remodel might run $70 to $400 per square foot depending on the level of finish. A 50-square-foot bathroom at a mid-range build-out would land around $10,000 to $15,000 in this method.

When to use it: Budget comparisons, scope planning, quick client-facing estimates for standard project types.

Detailed Line-Item Estimates

This is the gold standard. Every material, labor task, and expense has its own line with quantity, unit cost, and extended total. The homeowner can see exactly what they’re paying for, and you can track your actual costs against the estimate as the job progresses.

A detailed line-item estimate for a kitchen remodel might include 40-80 individual line items across demolition, framing, electrical, plumbing, drywall, cabinets, countertops, flooring, paint, trim, fixtures, appliances, permits, and cleanup.

When to use it: Every job where you want to protect your margin and build client trust. This is the format that wins contracts.

Lump Sum / Fixed Price

A lump sum estimate gives the client a single total price for the entire project. You still build it from detailed line items internally, but the client sees one number. This works well when the scope is clearly defined and unlikely to change.

Risk factor: If you miss something in your takeoff, you eat the cost. That’s why you need a thorough scope of work and contingency built in.

Time and Materials (T&M)

T&M estimates charge the client for actual labor hours plus materials at cost, plus your markup (typically 10% to 50% on materials). This shifts the cost risk to the client but gives you flexibility for projects where the full scope isn’t known upfront.

When to use it: Repair work where you don’t know what’s behind the wall, small handyman jobs, or clients who want to control scope on the fly.

What Every Estimate Should Include

Regardless of format, every professional estimate needs these components:

  1. Company information - name, license number, contact details, insurance info
  2. Client information - name, property address, contact
  3. Scope of work - what’s included AND what’s excluded (this is critical)
  4. Itemized costs - materials, labor, equipment, permits
  5. Overhead and profit - typically 15% to 35% combined (this isn’t padding, it’s what keeps the business alive)
  6. Timeline - start date, milestones, estimated completion
  7. Payment schedule - deposit amount, progress payments, final payment
  8. Terms and conditions - change order process, warranty, dispute resolution
  9. Expiration date - material prices change, don’t leave estimates open-ended (30 days is standard)
  10. Signature lines - both parties sign to create a binding agreement

Use our Contractor Estimate Template to make sure you never miss a section.

Estimate vs. Bid vs. Quote: What’s the Difference?

These terms get used interchangeably, but they have different implications.

TermBinding?Price CertaintyWhen Used
EstimateNon-bindingApproximateEarly conversations, project planning
QuoteTypically bindingFixed for stated periodAfter site visit, defined scope
BidBindingFixed, competitiveCompetitive bidding situations

An estimate is your best professional guess based on available information. It can change as the scope becomes clearer.

A quote is a firm price you’re offering for a defined scope. If the client accepts, that’s the price. You eat any overruns unless there’s a change order.

A bid is a competitive offer, usually in response to a request. You’re competing against other contractors, and the price is typically fixed once submitted.

Key takeaway: Know which one you’re providing. If a homeowner asks for “an estimate” but expects a binding price, you’ve got a misunderstanding that will cause problems later. Clarify upfront.

Worked Example 1: Mid-Range Bathroom Remodel

Here’s what a detailed line-item estimate looks like for a standard 50 sq ft bathroom remodel (gut-to-studs):

CategoryDescriptionCost Range
DemolitionStrip to studs, haul debris$800 - $1,500
Plumbing rough-inRelocate supply/drain lines$1,500 - $3,000
Electrical rough-inNew circuits, fan, lighting$800 - $2,000
Framing/subfloor repairRot repair, backer board$500 - $1,200
DrywallHang, tape, finish (Level 4)$600 - $1,200
Tile (floor + shower)Porcelain tile, installed$2,000 - $5,000
Vanity + topMid-range vanity, stone top$800 - $2,500
ToiletStandard toilet, installed$300 - $600
FixturesFaucet, showerhead, accessories$400 - $1,200
PaintWalls and ceiling, 2 coats$300 - $600
PermitBuilding permit$200 - $500
Subtotal$8,200 - $19,300
Overhead + Profit (20%)$1,640 - $3,860
Total$9,840 - $23,160

That puts a mid-range bathroom remodel in the $12,000 to $30,000 range for most markets, which aligns with industry data (Angi 2026, Remodeling Magazine Cost vs Value 2025). The final number depends on your market, material selections, and how much hidden work shows up on demo day.

Worked Example 2: Wood Privacy Fence (150 Linear Feet)

Here’s how a detailed fence estimate breaks down for a standard 6-foot privacy fence:

  • Post holes + concrete: 19 posts at $25 - $40 per post
  • 4x4 pressure-treated posts: 19 posts at $12 - $20 each
  • 2x4 rails (3 per section): 54 rails at $6 - $10 each
  • 6-ft fence pickets: 300 pickets at $3 - $6 each
  • Hardware (screws, brackets): $150 - $250 allowance
  • Labor: 150 linear feet at $5 - $20/lf

At $15 to $45 per linear foot installed (the typical range for wood privacy fencing), this 150-foot project comes in between roughly $2,250 and $6,750 total. The wide range comes from wood grade (standard vs. premium cedar), terrain (flat yard vs. slopes requiring stepped sections), and whether you’re removing an old fence first. Post spacing at 8 feet on center is standard for a 6-foot-tall privacy fence.

Common Mistakes That Cost You Money

1. Not Including Overhead and Profit

The biggest mistake newer contractors make. Your estimate covers materials and labor, but nothing for insurance, truck payment, tools, office costs, or your own salary. Industry standard overhead and profit runs 15% to 35% combined. If you’re not including it, you’re working at cost, and that’s a fast track to going out of business.

2. Forgetting the “Hidden” Line Items

Demo, haul-off, dump fees, permits, temporary protection, cleanup, and mobilization all cost real money. A bathroom demo generates 1-2 tons of debris. At $50 to $100 per dump run, that adds up. Build these into every estimate.

3. Underestimating Labor Hours

This is where field experience matters. If you’ve never tiled a shower, you might estimate 8 hours. An experienced tile setter knows that prep, layout, cutting, setting, grouting, and cleanup for a standard shower takes 16 to 24 hours. Tile installation labor runs $4 to $15 per square foot depending on complexity. Use production rates from your actual jobs, not wishful thinking.

4. Not Defining Scope Exclusions

“Install new kitchen” means different things to different people. Does it include appliance hookups? Backsplash? Painting? Under-cabinet lighting? If you don’t spell out what’s NOT included, the homeowner will assume it is. Put exclusions in writing.

5. Leaving the Estimate Open-Ended

Material prices change. Lumber can swing 20% in a month. Always include an expiration date (30 days is standard) and a clause that prices are subject to material cost changes.

Pro Tips for Estimates That Win Jobs

  • Respond fast. The contractor who responds first wins the job more often than not. Speed signals professionalism. If it takes you three days to send an estimate, the homeowner has already moved on.
  • Include photos or sketches. Visual context helps the homeowner understand the scope. Mark up a photo showing what’s being done where.
  • Explain the “why” behind your price. Don’t just list “$8,500 for tile.” Break it down: “$3,600 materials (120 sf porcelain at $6/sf + backer board + thinset + grout) + $4,900 labor (24 hours at $8/sf installed).” Transparency builds trust.
  • Offer good/better/best options. Give the homeowner three tiers. This anchors the conversation around value instead of “how cheap can you go.” Most clients pick the middle option.
  • Follow up. After you send the estimate, follow up at day 1, day 3, and day 7. Most contractors send it and forget it. The follow-up alone can increase your close rate by 20-30%.

EstimationPro doesn’t just build the estimate. It sends the proposal automatically and follows up with the homeowner so you win more of the bids you already send. Try EstimationPro free to see how the full workflow works: estimate, proposal, follow-up, invoice, paid.

How to Choose the Right Estimate Format

Match the format to the situation:

  • First phone call or quick consultation: Ballpark range. Don’t waste time on detailed takeoffs for tire-kickers.
  • After site visit, clear scope: Detailed line-item or lump sum. This is your real bid.
  • Repair work or unknowns: T&M with a “not to exceed” cap. Protects you and the client.
  • Competitive bidding: Lump sum with a detailed scope of work attached. The client gets a clean number, and the scope document protects you from scope creep.

Use our Construction Estimate Template to format your estimates professionally regardless of type.

FAQ

How long should a construction estimate be valid?

30 days is standard. Material prices fluctuate, and labor availability changes. After 30 days, let the client know the estimate may need to be updated. Some contractors use 14-day validity for volatile materials like lumber or steel.

Should I charge for estimates?

For small jobs (under $5,000), most contractors provide free estimates to stay competitive. For larger projects that require detailed takeoffs, site visits, and design work, charging $100-$500 for the estimate is reasonable and filters out non-serious clients. Many contractors apply the estimate fee toward the contract if the client proceeds.

How much contingency should I include in an estimate?

Build in 10% to 20% contingency for remodeling projects. Older homes need the higher end because there are more unknowns behind the walls. New construction can get away with 5-10%. Don’t show contingency as a separate line item. Spread it across your labor and material rates, or roll it into overhead.

What’s the difference between a contractor estimate and a construction estimate?

They’re essentially the same thing. “Contractor estimate” typically refers to the total price from the general contractor (including markup and overhead). “Construction estimate” can refer to the raw cost breakdown of a project before contractor profit is added. For residential remodeling, the terms are interchangeable.

How do I handle estimates for work I haven’t done before?

Get sub-contractor quotes for the unfamiliar scope, add your markup (typically 10% to 50%), and include it in your estimate. Don’t guess at pricing for work outside your experience. Bad estimates come from guessing, not from getting real numbers.

All prices reflect 2026 national averages. Prices vary by region, material selections, and project conditions. Always verify with local suppliers and subcontractors before finalizing your estimate.

Get Free Estimating Tips

Enter your email and we'll send you pro tips, cost data, and useful resources for contractors.

We'll send helpful resources and occasional tips. Unsubscribe anytime.

EstimationPro AI For Contractors, By Contractors

Create Detailed Estimates in Minutes, Not Hours

Upload photos, record voice notes, and get AI-powered estimates with line items, material lists, and regional pricing.

Photos & voice to estimate PDF proposals & schedules Regional pricing data
No credit card required Set up in under 2 minutes Trusted by contractors nationwide