Quick Answer

Enter your ADU square footage and pick the type to get a per-square-foot cost range. A garage conversion runs $100-$280/sf, a detached new build $250-$500/sf. A typical 600 sq ft detached ADU on a new slab runs $155,000-$237,000. The fastest way to cut the price is converting an existing garage or basement instead of building from scratch.

Inputs you'll need

  • ADU square footage (floor area of the finished unit)
  • ADU type: garage conversion, interior/basement conversion, attached, detached, or prefab
  • Foundation: reuse an existing slab, new slab, or crawlspace/pier
  • Finish level: standard (builder-grade) or premium (custom cabinets, tile, hardwood)
  • Whether utility connections (sewer, water, electrical) are already close by - these add $10,000-$40,000 on a detached unit

Related tools: Room Addition Cost Calculator for a room added to the main house, Contractor Estimate Template to turn these numbers into a formal bid.

Typical ADU: 400-1,200 sq ft

or

Enter the ADU square footage to see a detailed cost estimate.

ADU Cost Guide

Per-square-foot costs by ADU type, conversion vs. detached, and what drives the budget.

How Much Does It Cost to Build an ADU in 2026?

An ADU costs $100–$500 per square foot in 2026, depending on whether you convert an existing space or build a detached unit from scratch. Most finished ADUs land between $100,000 and $400,000.

  • Garage or basement conversion: $100–$280/sq ft
  • Attached ADU (addition): $180–$420/sq ft
  • Detached new-build ADU: $250–$500/sq ft
  • Prefab / modular detached: $150–$360/sq ft
  • Typical 600 sq ft detached ADU: $155,000–$237,000

The biggest swing is whether you already have a shell to work with. A garage conversion reuses the foundation, walls, and roof, so it runs roughly half the per-square-foot cost of a detached new build.

Key Takeaways

  • Garage/basement conversion: $100–$280/sq ft
  • Detached new build: $250–$500/sq ft
  • 600 sq ft detached ADU: $155,000–$237,000

What Drives ADU Cost Up or Down

Utility connections and site work are where ADU budgets blow up. A kitchen and full bath mean running water, sewer, and a separate electrical service to the unit.

  • Utility hookups: Tying into sewer, water, and electrical often adds $10,000–$40,000, especially on a detached unit set back from the main house.
  • Foundation: A new slab runs $8–$15/sq ft; a crawlspace or raised pier system runs $12–$22/sq ft. Reusing an existing garage slab is $0.
  • Kitchen and bath: Every ADU needs a full kitchen and at least one bathroom, so fixed costs stay high even on a small unit.
  • Permits and impact fees: $3,000–$25,000 depending on your city. Some jurisdictions waive impact fees for ADUs, others do not.
  • Finish level: Builder-grade cabinets and LVP flooring keep it affordable. Custom cabinets, tile, and hardwood push you into premium pricing.

Prices vary by region. Get multiple bids from local contractors before you commit, and confirm each bid covers utility connections and permits, not just the shell.

Key Takeaways

  • Utility hookups add $10,000–$40,000
  • New slab $8–$15/sq ft; reusing a garage slab is $0
  • Permits and impact fees: $3,000–$25,000

Conversion vs. Detached ADU: Which Is Cheaper?

A garage or basement conversion costs 40–60% less than a comparable detached ADU because the structure already exists.

  • Conversion: Reuses the foundation, framing, and roof. The work is insulation, egress, plumbing, electrical, and finishes. Cheapest and fastest path to a legal unit.
  • Detached: A stand-alone building with its own foundation, roof, and utility trenching. Highest cost, but it functions as a true separate rental and usually appraises highest.
  • Attached: Shares one wall with the main house, splitting the difference on cost and disruption.
  • Prefab: A factory-built unit dropped on a prepared foundation. Faster and often cheaper than site-built detached, but you still pay for the pad and utility hookups.

If budget is the priority and you have a garage you can give up, a conversion wins. If you want maximum rental income and resale value, a detached unit is worth the premium.

Key Takeaways

  • Conversion costs 40–60% less than detached
  • Detached ADUs appraise and rent highest
  • Prefab saves time but still needs a pad and hookups

ADU cost by type and size (2026)

Standard finish estimates. Conversions reuse the existing foundation; detached, attached, and prefab units assume a new slab. Includes shell, kitchen, bath, electrical, HVAC, and permits. Excludes major utility trenching ($10,000-$40,000) and off-site impact fees where charged.

ADU Type 400 sf 600 sf 800 sf
Garage / basement conversion $40K - $80K $60K - $120K $80K - $160K
Prefab / modular detached $63K - $110K $95K - $165K $126K - $220K
Attached ADU $75K - $126K $113K - $189K $150K - $252K
Detached ADU (new build) $103K - $158K $155K - $237K $206K - $316K

Prices vary by region - get multiple bids from local contractors before you commit.

What gets left out of ADU quotes

  • Utility connections. A kitchen and full bath mean running sewer, water, and a separate electrical service to the unit. On a detached ADU set back from the house, that trenching and tie-in runs $10,000-$40,000. It is the number one thing missing from a headline "per square foot" price.
  • Impact and permit fees. Cities charge $3,000-$25,000 in permit and impact fees. Some waive them for ADUs, some do not. A quote that lists "labor and materials" only can leave this entirely on you.
  • Bringing a conversion up to code. A garage looks cheap to convert until you add egress windows, insulation, a moisture barrier, and a raised subfloor. These are code requirements for living space, not upgrades.
  • Panel and service capacity. A full dwelling with a kitchen, HVAC, and laundry often needs its own subpanel or a service upgrade. A panel or service upgrade is $1,500-$5,000 and it is not optional.
  • Site access and grading. If a truck or crane cannot reach the backyard, or the lot needs grading and drainage, that shows up after the bid, not in it.

Related tools

Once your ADU costs are dialed in, EstimationPro turns the estimate into a proposal, sends it automatically, follows up with the homeowner, and handles invoicing and deposit collection - so you win more of the bids you already send and spend less time chasing paperwork.

How to Use This Calculator

Enter ADU Square Footage

Input the floor area of your planned accessory dwelling unit. Most ADUs run 400 to 1,200 square feet.

Select ADU Type

Choose a garage conversion, interior/basement conversion, attached ADU, detached new build, or prefab unit. Whether you reuse an existing shell is the single biggest cost driver.

Choose Foundation and Finish Level

Select your foundation (reuse an existing slab for $0, a new slab at $8-$15/sf, or a crawlspace/pier at $12-$22/sf) and finish level (standard builder-grade or premium).

Review Cost Breakdown

See an itemized breakdown covering framing, roofing, plumbing, electrical, HVAC, kitchen, bath, finishes, permits, and foundation with low-to-high ranges.

ADU Cost Formula

Total = (Square Footage x Cost per SF) + (Square Footage x Foundation Cost per SF)

Where:

Garage / Interior Conversion
= $100-$200/sf standard, $200-$280/sf premium
Attached ADU
= $180-$300/sf standard, $300-$420/sf premium
Detached ADU
= $250-$380/sf standard, $380-$500/sf premium
Foundation
= Existing $0, New Slab $8-$15/sf, Crawlspace/Pier $12-$22/sf

Free to Embed on Your Website

Add this calculator to your blog, resource page, or client portal — just copy one line of code. Your visitors get a useful tool, you get more engagement.

100% freeAuto-resizesMobile responsiveNo sign-up required
EstimationPro AI For Contractors, By Contractors

Get a Detailed Estimate, Not Just a Rough Number

Upload photos or voice notes and get AI-generated line-item estimates with regional pricing, material lists, and project schedules.

Photos & voice to estimate PDF proposals & schedules Regional pricing data
No credit card required Set up in under 2 minutes Trusted by contractors nationwide

Frequently Asked Questions

How much does it cost to build an ADU?

An ADU costs $100 to $500 per square foot in 2026, or roughly $100,000 to $400,000 for a finished unit. A garage or basement conversion runs $100-$280/sf, an attached ADU $180-$420/sf, and a detached new build $250-$500/sf. The big jump comes from building a new foundation, roof, and utility connections from scratch instead of reusing an existing structure.

How much does a 600 sq ft ADU cost?

A 600 sq ft detached ADU costs $155,000-$237,000 at standard finish on a new slab. As a garage conversion, the same 600 sq ft runs $60,000-$120,000 because you reuse the foundation and roof. Premium finishes - custom cabinets, tile, hardwood - push a 600 sq ft detached unit past $300,000.

Is a garage conversion cheaper than a detached ADU?

Yes. A garage conversion costs 40-60% less than a comparable detached ADU because the foundation, walls, and roof already exist. Your money goes into insulation, egress windows, plumbing, electrical, and finishes instead of a whole new structure. The trade-off is you lose the garage, and older garage slabs sometimes need reinforcement or a moisture barrier to pass inspection as living space.

Does an ADU add value to my home?

A permitted ADU typically returns 60-100% of its cost at resale and generates rental income in the meantime. A detached, legally permitted unit adds the most value because it functions as a separate rentable dwelling. As with any addition, prices vary by region - get local quotes and confirm the unit is permitted, because appraisers discount or exclude unpermitted square footage.

How do contractors price an ADU for a client?

I price ADUs by the square foot for the shell, then add foundation, utility connections, and permits as separate line items because those fixed costs are where quotes go wrong. For a detached unit I start at $250-$380/sf, add $8-$15/sf for the slab, then layer in $10,000-$40,000 for sewer, water, and electrical trenching plus permit and impact fees. Use our Contractor Estimate Template to turn those line items into a clean bid the homeowner can actually read.

How long does it take a contractor to estimate an ADU?

An ADU estimate takes me 2 to 4 hours done by hand because it is essentially a small house - foundation, framing, a full kitchen, a bath, and separate utility connections all have to be priced. The slow part is the utility tie-in and confirming what the city requires. With EstimationPro I cut that to under an hour - I walk the site, talk through the scope, and it builds the line-item estimate so I can quote the homeowner in days instead of weeks.

What permits do I need to build an ADU?

An ADU almost always requires a building permit, plus electrical, plumbing, and mechanical permits, and often a planning or zoning review. Permit and impact fees run $3,000-$25,000 depending on your city - some jurisdictions waive impact fees for ADUs to encourage housing, others charge full price. Never skip permits. An unpermitted ADU cannot be legally rented and gets excluded from your home's square footage at resale.

What is the cheapest way to build an ADU?

The cheapest ADU is a garage or basement conversion at $100-$280/sq ft, because you reuse the existing foundation, walls, and roof. A prefab or modular detached unit is the next most affordable path for a stand-alone build. To keep any ADU affordable, reuse existing utility runs where possible, stick to a simple rectangular footprint, and choose builder-grade finishes. Get multiple bids from local contractors before you commit.

Related Articles

Why Contractors Choose EstimationPro AI

Estimates in 60 Seconds

AI generates detailed, line-item estimates from basic project details. No more hours on spreadsheets.

Accurate Pricing Data

Built on real contractor pricing and industry cost databases, updated for 2026 market conditions.

Professional Proposals

Send polished PDF estimates with your branding. Clients see a professional contractor they can trust.

Get Paid Faster

Built-in invoicing and Stripe payments. Collect deposits and progress payments directly from estimates.

Related Free Tools

Try EstimationPro AI

Generate a full estimate for this same job in 90 seconds.

Snap photos, talk through the scope, drop in your notes. The AI builds line items, labor hours, and a timeline you can send to the client.

1 free estimate, no card needed Set up in under 2 minutes Built by a 20-year contractor
Try AI Estimate Free Free to try. No credit card.
Get detailed estimates, not rough numbers