Follow up on a quote three times, then close it out. Confirm it arrived within a day, ask a specific question around day 3 to 5, give a real reason to decide around day 7, and send a polite close-out note at day 14. Below are the timing, a copy-ready email and text for every step, a short phone script, and what to send when the client says the price is too high.
Quick Answer
A good quote follow up is three short, specific messages over about a week, then one close-out note. Each one has a job: make sure the quote landed, pull out the question that’s stalling the client, and give them an honest reason to decide (a start date or the date your prices expire). Never open with “just checking in,” and never cut your price to get a reply.
| When | Channel | Job of the message |
|---|---|---|
| Day 0 | Email the quote, text a heads-up | Tell them it’s sent and when you’ll check in |
| Day 1 to 2 | Text or email | Make sure it arrived and they can open it |
| Day 3 to 5 | Ask a specific question about the scope or price | |
| Day 7 | Email, call on bigger jobs | Give a real reason to decide: start date or expiry |
| Day 14 | Close it out politely, leave the door open | |
| Day 60 to 90 | Email or text | Offer to update the numbers if it’s still on their list |
Try EstimationPro free if you want the first three reminders sent for you.
Why the Second and Third Follow-Up Win Jobs
I’ve been bidding residential remodels for over 20 years, and a lot of my jobs were won on the second or third follow-up, not the day the estimate went out. In my experience, most contractors send a bid and never chase it. So the one who follows up, politely and on schedule, stands out as the contractor who has their act together.
Silence after a quote almost never means no. Here’s what’s usually going on:
- They’re busy. Your estimate is one email in a pile, and they meant to read it this weekend.
- They’re waiting on other bids and don’t want to decide until they have them all.
- Someone else has to sign off, a spouse, a parent or a lender.
- The number surprised them. Most homeowners have no clue what a remodel actually costs, and some go quiet instead of telling you.
- Something on the quote confused them, and asking feels awkward.
Every one of those gets fixed by a short, useful message. None of them gets fixed by waiting.
The other reason to chase it is what that quote already cost you. Daniel Dixon, a home service owner interviewed by Jobber, estimated it can cost up to $250 just to get someone to call, and $400 to $500 for one quote once you count a salesperson’s time. Even if your numbers are lower, you paid for the lead, the drive, the walk-through and the hours building the bid. Ten minutes of follow-up protects all of that.
Here’s the math with round numbers, just to show the scale. Say you send 8 quotes a month that average $15,000. If following up turns one more of those into a signed job each month, that’s $15,000 more work a month and $180,000 over a year. Your numbers will differ. The point is that one extra job pays for a lot of ten-minute emails.
How Long to Wait: What the Guides Say
The published advice lines up closely. Here’s what four contractor-software guides recommend, as of October 2026:
| Guide | First follow-up | How many before moving on |
|---|---|---|
| Housecall Pro | 24 to 48 hours after sending | ”Two or three follow-ups are plenty” |
| Jobber | 2 to 3 days after the quote | Move on after the second follow-up |
| Fieldmotion | Courtesy check at 24 to 48 hours, main follow-up at 3 to 5 days | Three to four for most jobs |
| Joist | 2 to 5 days after the estimate | Mark it cold after 3 or more |
My take: keep the first touch fast and tiny, since early silence often just means the email got buried. The real follow-ups come after they’ve had a few days to read it. Three plus a close-out note fits most residential jobs. More starts to feel like pressure.
Set Up the Follow-Up Before You Send the Quote
The easiest follow-ups are the ones you set up while you’re still at the kitchen table with the client.
- Ask how they want to hear from you. Email, text or a call. Get their cell number and ask if it’s OK to text. According to Housecall Pro’s guide, make sure you have permission before you follow up by text.
- Tell them when you’ll check in. “I’ll have this to you by Wednesday and I’ll touch base Friday.” Now your follow-up is a promise kept, not an interruption.
- Put an expiry date on the quote. According to Fieldmotion, a 30-day validity period is standard practice and customers expect it. It also gives you an honest reason to follow up later: material prices move, and the number is only good for so long.
- Itemize the scope. A line-item estimate lets them compare your bid against the others line by line. The cheapest bid usually leaves things out, and an itemized quote makes that visible. A contractor estimate template or construction proposal template gives you the structure, and the contractor quote template post covers what to include.
- Send it fast. Homeowners often go with whoever quotes first, not whoever’s best. I’ve lost jobs to slow quotes. A follow-up can’t save a bid that showed up after they already signed with someone else.
Copy-Ready Quote Follow-Up Templates
Swap in your details where you see brackets, or use the print button at the top of this page to print the set or save it as a PDF. Each one reads in under 30 seconds and gives the client one easy thing to reply to.
Day 0: Heads-up text when you send the quote
Hi [First name], it’s [your name] with [Company]. I just emailed your estimate for the [bathroom remodel]. It’s from [your email] in case it lands in spam. I’ll check in with you [Friday]. Any questions before then, just text me back.
Day 1 to 2: “Did it come through?” email
Subject: Your [bathroom remodel] estimate from [Company]
Hi [First name],
I sent your estimate for the [bathroom remodel] on [day]. Emails from someone new sometimes end up in spam, so here’s the link again: [link to estimate].
If anything on it is unclear, reply here or text me at [your cell].
[Your name] [Company] | [License number]
If you already know they opened it, skip this one and go straight to the next.
Day 3 to 5: The question email
This is the most important follow-up. Don’t ask “any questions?” Ask about the thing people usually get stuck on for that kind of job.
Subject: Questions on your [kitchen] estimate?
Hi [First name],
Have you had a chance to go through the estimate? Most people have a question or two once they see the line items, usually about [the cabinet allowance / what’s included in demo and haul-off / the permit].
I’m happy to walk through it with you on the phone or at the house. Fifteen minutes usually covers it. Is there anything on there you want added, taken out or explained?
[Your name]
Day 3 to 5: The question text
Hi [First name], [your name] here. Did the estimate make sense? If the total is more than you planned on, tell me. There’s usually a way to adjust the scope or materials to get closer to your number.
That last line does a lot of work. It gives a client who had sticker shock permission to say so, instead of disappearing.
Day 7: The reason-to-decide email
Use the version that’s true. Never invent a deadline or a “last opening” you don’t have. Clients can tell, and it costs you trust you’ll need for the whole job.
Subject: Holding a start date for your [deck]
Hi [First name],
Quick scheduling update. I have an opening starting the week of [date], and I’d like to hold it for you if you’re moving forward. The prices on your estimate are good through [expiry date]. After that I’ll need to recheck material costs before I can confirm them.
If you’re still comparing bids, no problem. Just make sure each one covers the same work, like [demo, haul-off, permits, and finish trim], so you’re comparing the same job.
Want me to hold the date?
[Your name]
The apples-to-apples line isn’t a sales trick. It’s the same advice I’d give my own mom if she were hiring a contractor, and it helps the client spot a low bid that left out half the scope.
Day 7: Short phone script (bigger jobs)
On larger jobs, a call after two unanswered emails is worth it. If you get voicemail, leave this and hang up:
“Hi [First name], it’s [your name] with [Company] about your [kitchen] estimate. No rush. I’m calling to see if you had questions, and to let you know I can hold a start date the week of [date]. You can call or text me back at [number]. Thanks.”
If they pick up, ask “Where are you at with the project?” and listen.
Day 14: The close-out email
Subject: Should I close out your estimate?
Hi [First name],
I haven’t heard back, so I’m guessing the timing isn’t right or you went another direction. Either is fine. I’ll close out the estimate on my end so I’m not filling up your inbox.
If you want to pick it back up later, reply to this email and I’ll update the numbers for you.
Thanks for having me out to look at the job.
[Your name]
A close-out note gives a client who has been meaning to reply a reason to do it now, and it frees you to stop chasing a job that’s gone.
When they say the price is too high
Subject: A couple of ways to adjust your [bathroom] estimate
Hi [First name],
Thanks for being straight with me about the budget. Here are two ways to bring the total down without cutting corners on the work you can’t see:
- [Keep the existing tub and re-tile the surround], which takes about $[amount] off.
- [Go with a stock vanity instead of custom], which takes about $[amount] off.
I can also phase the work, doing [the shower] now and [the floor and vanity] next year.
What I won’t do is knock the same scope down by a percentage, because that money has to come out of the prep work or the materials. Want me to send a revised estimate with either option?
[Your name]
When they hire someone else
Hi [First name], thanks for letting me know, and congrats on getting the project going. If you don’t mind me asking, what made the difference: price, timing or something about my estimate? It helps me bid better. If anything comes up down the road, I’m here.
Their answer is the cheapest business advice you’ll ever get. Write it down.
Day 60 to 90: The reopen note
Hi [First name], back in [month] I priced your [deck]. If it’s still on your list, I can update the estimate for [spring]. No pressure either way.
Don’t Discount to Get a Reply
When a quote goes quiet, the first instinct is to knock 10% off and send it again. Run the numbers before you do.
Say the job is $20,000 and you priced it for a 30% gross margin. Your cost is $14,000 and your gross profit is $6,000. Take 10% off the price and the job is $18,000. Your cost is still $14,000, so gross profit drops to $4,000. A 10% discount just cut your profit by a third.
| Original quote | After a 10% discount | |
|---|---|---|
| Price | $20,000 | $18,000 |
| Job cost | $14,000 | $14,000 |
| Gross profit | $6,000 | $4,000 |
| Gross margin | 30% | 22.2% |
Check your own job with the profit margin calculator. If the client needs a lower number, change the scope or the materials, like the price-objection template above. Then the price comes down because the job got smaller, not because your profit did.
There’s also a type of client you shouldn’t chase at all. If someone is shopping purely on price, I’d rather refer them to someone else. Those jobs tend to end with an unhappy client and a contractor who lost money or cut corners.
What Not to Say in a Follow-Up
- “Just checking in” or “just following up.” It tells them nothing and gives them nothing to reply to.
- A fake deadline. “Price good until Friday” when it isn’t. If they call your bluff, you’ve lost the job and your credibility.
- A guilt trip. “I spent three hours on this estimate.” That’s your cost of doing business, not their problem.
- Three questions at once. Ask one. One question gets an answer.
- A text at 9 p.m. Text during working hours.
Track Every Open Quote
When you’re busy on a job site, follow-ups are the first thing to slip. The fix is a simple log you look at every morning. A notebook works. So does a spreadsheet with these columns:
| Client | Job | Quote total | Sent | Opened? | Follow-up 1 | Follow-up 2 | Follow-up 3 | Closed out | Result | Why |
|---|---|---|---|---|---|---|---|---|---|---|
| [Name] | [Bath remodel] | $[total] | [date] | [Y/N] | [date] | [date] | [date] | [date] | [Won / Lost / Open] | [Reason] |
The “Why” column is the one that makes you better. Over time you’ll see whether you lose on price, on timing, or because clients never really read the estimate. Each has a different fix.
FAQ
How many times should I follow up before giving up?
Three follow-ups plus a close-out note covers most residential jobs. Housecall Pro says two or three are plenty, and Fieldmotion says three to four. After the close-out, move the quote to a “check back in 60 to 90 days” list.
Should I follow up by text or email?
Use whatever the client said they prefer. A text is good for the quick “did you get it?” touch. Email is better for anything with details, because they can forward it to a spouse or keep it with the other bids. Only text clients who said texting is OK.
The client opened the quote but didn’t reply. What do I send?
Send the day 3 to 5 question email. An opened quote with no reply usually means they have a question or the number surprised them. Name the thing people usually get stuck on and offer a short call or site visit.
Is following up three times pushy?
Not if every message is short and gives them something useful: the link again, an answer to a common question, a real start date. Pushy is “just checking in” every other day, fake deadlines and pressure. A close-out note at the end shows you respect their decision.
Should I lower my price if they don’t respond?
No. Silence usually isn’t about price, and a blind discount comes straight out of your profit. If price is the problem, offer a smaller scope or different materials. Rework the numbers with the contractor markup calculator before you send a revised estimate.
Let the First Three Follow-Ups Run Without You
The hard part of follow-up isn’t writing the message. It’s remembering to send it while you’re framing a wall or setting tile. I use the automatic follow-up in EstimationPro on my own remodeling jobs for exactly that reason.
When you send an estimate from EstimationPro, the client gets a reminder email at 24 hours if they haven’t opened it, another 48 hours after they open it if they haven’t responded, and a final one at 7 days. It stops when the estimate expires or the client opts out. It only works on estimates sent from EstimationPro, not bids you send another way. The estimate itself comes from your photos, a voice walkthrough or notes, and contractors save 2+ hours per estimate. Pro adds invoices, deposit collection and milestone payment schedules once they say yes. Plans are $79 or $149 a month, with a 7-day free trial ($0 today). Try EstimationPro free and let the follow-up sequence chase the bids you already sent.
Sources
Checked October 15, 2026. Software guides change; confirm current advice on each site.
- Jobber Academy, How to Follow Up on a Quote (timing, Daniel Dixon’s cost estimates): getjobber.com
- Housecall Pro, How to Follow Up on a Quote (timing, follow-up count, texting permission): housecallpro.com
- Fieldmotion, How to Follow Up on Quotes (phrases to avoid, 30-day validity, follow-up count): fieldmotion.com
- Joist, How to Follow Up on an Estimate (timing, when to mark a prospect cold): joist.com
Pricing a job like this?
Get every line item priced for your area in a full estimate
Describe the job or snap a few photos. Send it from EstimationPro and it follows up with your client for you.
7-day free trial. $0 today, card required, cancel anytime.
Get Free Estimating Tips
Enter your email and we'll send you pro tips, cost data, and useful resources for contractors.
We'll send helpful resources and occasional tips. Unsubscribe anytime.
EstimationPro AI For Contractors, By Contractors Professional Estimates That Follow Up for You
Priced line items, a clean PDF or client link, and automatic follow-up once you send it.