Free Kitchen Remodel Checklist with Cost Estimates (2026)

Free kitchen remodel checklist with built-in cost estimates. Check off 11 items from demolition to permits and see a live budget breakdown by quality level.

Built by a 20-year contractor By Brad
sq ft

Average U.S. kitchen is 100-200 sq ft

LF

Measure all base and wall cabinet runs

sq ft

Typical range: 25-50 sq ft

Quality Level
or

11 of 11 items included

100%

|
$750.00 - $1,800.00
$4,000.00 - $8,000.00
$1,200.00 - $2,400.00
$450.00 - $1,200.00
$900.00 - $1,800.00
$1,500.00 - $3,500.00
$1,500.00 - $3,500.00
$4,000.00 - $8,000.00
$450.00 - $900.00
$700.00 - $1,500.00
$300.00 - $800.00

Kitchen Remodel Budget Estimate

Kitchen Size

150 sq ft

Mid-Range quality, 11 items

Estimated Total

$15,750.00 - $33,400.00

$105.00 - $222.67 per sq ft

Cost Breakdown by Item

Demolition & Disposal$750.00 – $1,800.00(5%)
Cabinets & Hardware$4,000.00 – $8,000.00(24%)
Countertops$1,200.00 – $2,400.00(7%)
Backsplash$450.00 – $1,200.00(4%)
Flooring$900.00 – $1,800.00(5%)
Plumbing Rough-In$1,500.00 – $3,500.00(10%)
Electrical & Lighting$1,500.00 – $3,500.00(10%)
Appliances$4,000.00 – $8,000.00(24%)
Painting & Drywall Repair$450.00 – $900.00(3%)
Sink & Faucet$700.00 – $1,500.00(4%)
Permits & Inspections$300.00 – $800.00(2%)
ItemLowHigh
Demolition & Disposal$750.00$1,800.00
Cabinets & Hardware$4,000.00$8,000.00
Countertops$1,200.00$2,400.00
Backsplash$450.00$1,200.00
Flooring$900.00$1,800.00
Plumbing Rough-In$1,500.00$3,500.00
Electrical & Lighting$1,500.00$3,500.00
Appliances$4,000.00$8,000.00
Painting & Drywall Repair$450.00$900.00
Sink & Faucet$700.00$1,500.00
Permits & Inspections$300.00$800.00
Total$15,750.00$33,400.00

Estimates based on 2026 national averages. Actual costs vary by location, contractor, and material selections.

Typical Kitchen Remodel Timeline

Plan 6-12 weeks for a full kitchen remodel. Here is how the phases break down.

PhaseDuration
Planning & Design2-4 weeks
Permits1-6 weeks
Demolition1-3 days
Rough-In3-5 days
Drywall & Paint3-5 days
Cabinets & Countertops3-7 days
Backsplash & Flooring2-4 days
Fixtures & Appliances1-2 days
Punch List1-2 days

Free to use. No signup needed.

Last updated: 2026-04-02

How to Use This Calculator

Enter your kitchen measurements

Add your kitchen floor area in square feet, cabinet linear feet, and countertop area. The checklist uses these numbers to calculate costs for each line item.

Pick your quality level

Choose Budget, Mid-Range, or High-End. Each tier adjusts pricing for cabinets, countertops, appliances, and every other item on the checklist.

Check or uncheck items

Toggle each checklist item on or off. Keeping cabinets but skipping a backsplash? Uncheck it and your total updates instantly.

Review your budget estimate

See an itemized cost breakdown table, bar chart, and total range. Print or share the checklist with your contractor or client.

Free to Embed on Your Website

Add this calculator to your blog, resource page, or client portal — just copy one line of code. Your visitors get a useful tool, you get more engagement.

100% freeAuto-resizesMobile responsiveNo sign-up required
EstimationPro AI For Contractors, By Contractors

Get a Detailed Estimate, Not Just a Rough Number

Upload photos or voice notes and get AI-generated line-item estimates with regional pricing and material lists.

Photos & voice to estimate PDF proposals & schedules Regional pricing data
No account or credit card required Automatic client follow-up Built by a contractor who uses it on his own remodeling jobs

Frequently Asked Questions

How much does a kitchen remodel cost in 2026?

A budget kitchen remodel runs $10,000-$30,000 (stock cabinets, laminate counters, vinyl flooring). A mid-range remodel costs $30,000-$60,000 (semi-custom cabinets, granite or quartz, tile floors). A high-end remodel ranges from $60,000 to $150,000+ (custom cabinets, marble or premium quartz, hardwood floors, commercial-style appliances). These numbers are national averages and vary by location.

What order should a kitchen remodel follow?

The standard sequence is: 1) Planning and design, 2) Permits, 3) Demolition, 4) Rough-in plumbing and electrical, 5) Drywall and paint, 6) Cabinet installation, 7) Countertop template and install, 8) Backsplash and flooring, 9) Fixtures and appliances, 10) Punch list and final inspection. Skipping this order causes rework. For example, installing countertops before cabinets are set means the template will be wrong.

What takes the longest in a kitchen remodel?

Cabinet lead times are the biggest delay. Stock cabinets ship in 1-2 weeks, semi-custom take 4-8 weeks, and full custom cabinets can take 8-16 weeks. Permit approval is the second most common delay, ranging from 2 days to 6 weeks depending on your jurisdiction. Order cabinets and pull permits as early as possible to avoid stalling the project.

What is the most expensive part of a kitchen remodel?

Cabinets and hardware typically account for 30-35% of the total budget, making them the single largest expense. Countertops are second at 10-15%, followed by appliances at 15-20%. Labor for plumbing, electrical, and installation makes up the rest. One way to save: keep your existing layout so you avoid moving plumbing and electrical lines.

Do I need a permit for a kitchen remodel?

In most jurisdictions, yes. Any work that involves moving or adding plumbing lines, electrical circuits, gas lines, or structural changes (removing a wall, adding a window) requires a building permit. Cosmetic-only updates like painting, replacing cabinet doors, or swapping a faucet in the same location typically do not. Check with your local building department before starting work. Unpermitted work can cause problems when you sell the home.

Related Tools

Related Articles

What EstimationPro Does for Contractors

Photos, Voice or Notes In

Describe the job with photos, a voice walkthrough or typed notes and get priced line items for labor and materials. Contractors save 2+ hours per estimate.

Priced for Your Area

Labor and material rates are adjusted for the job's location. You review and edit every line before it goes out.

Automatic Follow-Up

Send the estimate from EstimationPro and your client gets a reminder at 24 hours, 48 hours and 7 days. Many jobs are won on the second or third follow-up.

PDF, Link and Payments

Export a PDF or share a link your client can approve. Collect payments online with Stripe; deposits, milestone schedules and invoices are on Pro.

Related Free Tools

Try EstimationPro AI

Turn this job into a full, priced estimate for your client.

Snap photos, talk through the scope, drop in your notes. The AI prices every line item with labor and material rates adjusted for your region, and checks the math.

3 free estimates in the first 7 days, no card needed Automatic client follow-up Built by a 20-year contractor
Start Free Try without an account Free to start. No credit card.
Get detailed estimates, not rough numbers