Roofing Proposal Template (Free, Printable)

Free roofing proposal template. Price Good, Better and Best roof options per square from your costs, add decking unit prices, then print or save it as a PDF.

Built by a 20-year contractor By Brad

Last updated: 2026-11-20

This roofing proposal template is built for re-roofs, where the homeowner is choosing between roof systems. Fill in the roof, the layers coming off and what you found, then build up to three options (Good, Better, Best) side by side with shingle, underlayment, ice and water shield, both warranties and one price each. Every price is worked out per square from your materials, labor, tear-off, dumpster and permit at the margin you set, and the template shows what you keep. Unit prices for rotted decking and fascia go on the page before tear-off, add-ons sit below for the client to initial, and the proposal ends with a check-one box and signature lines. Print it or save it as a PDF. Measuring the roof first? Print the blank form. A worked 20-square proposal is below.

Measuring the roof first?
Your Company
Client, Roof and What You Found
Measurements and Your Costs (the client never sees these)

Ordered squares = measured squares × (1 + waste), rounded up. Each option price = (ordered squares × materials per square + other materials + measured squares × labor per square + tear-off + disposal + permit) ÷ (1 − margin), rounded up to the dollar.

More for hips, valleys, dormers

Share of the price you keep for overhead and profit

Roof System Options

Fill in one, two or three options. Materials per square is everything you buy by the square at your cost (shingles, underlayment, starter, ridge cap, nails). Other materials is the lump for drip edge, flashing, pipe boots, vents and ice and water shield. Leave the price blank to use the suggested price, or type your own. An option with no price is left off the proposal.

Unit Prices for Damage Found After Tear-Off

You cannot see the deck until the old roof is off. Put the price per sheet or per foot on the proposal so a rotted sheet is a small agreed charge, not an argument.

Optional Add-Ons

Priced on the proposal for the client to initial. Not in any option price.

Scope, Schedule and Payment

Enter the measured squares and materials per square (or a price) for at least one option.

Free to use. No signup needed.

How to Write a Roofing Proposal

What goes in it, pricing Good-Better-Best roofs per square, a worked 20-square proposal, decking unit prices, warranties and deposits.

What Goes in a Roofing Proposal (and How It Differs From an Estimate)

A roofing estimate prices one roof. A roofing proposal asks the homeowner to pick one and sign. On a re-roof most homeowners are choosing between a basic shingle and an upgrade or two, so the proposal puts what you found, the roof systems side by side, what every option includes, what happens if the deck is rotten, and one signature on the same few pages. If you only need to price a single roof line by line, the roofing estimate template is the shorter tool.

  • Header: company, license and insurance, client, job address, date, and how long the prices are good for
  • What you found: roof style and pitch, measured area in squares, the existing roofing and how many layers come off, and the problems you saw (curling, granule loss, failed boots, soft decking)
  • Options: for each one, the shingle line, underlayment, ice and water shield, ventilation and flashing, the manufacturer warranty and your workmanship warranty, and one price
  • Included in every option: tear-off to the deck, drip edge, starter, ridge cap, pipe boots, flashing, permit, nail sweep and haul-off
  • Unit prices for hidden damage: decking per sheet, fascia per foot, and an extra layer per square, approved by the client before the work
  • Optional add-ons: gutters, skylights, chimney flashing, priced separately for the client to initial
  • Payment, schedule and acceptance: deposit and balance, weather note, and a signature block where the client checks one option

The big template sites agree on most of this. Jobber's roofing proposal FAQ lists a roof inspection summary, a work breakdown, costs with "roofing material costs and quantities," optional services, exclusions, how long the pricing is valid, terms and a signature. JobNimbus adds tear-off specifications, including the number of existing layers to be removed. ServiceTitan's template keeps separate fields for the manufacturer's warranty and the workmanship warranty.

Key Takeaways

  • A proposal compares roof options; an estimate prices one roof
  • State the layers coming off and what you found before the prices
  • Put unit prices for rotted decking on the page before tear-off

How to Price Each Option Per Square

Price every option from your cost per square, then divide by (1 − your target margin). A square is 100 sq ft of roof. Measure the roof, add a waste allowance for what you order, and keep labor on the measured squares, because your crew lays the roof, not the waste pile.

  • Ordered squares: measured squares × (1 + waste), rounded up. A simple gable wastes less than a cut-up hip roof with valleys and dormers, so set the allowance for each roof. The roofing calculator turns measurements and pitch into squares
  • Materials per square: everything you buy by the square at your cost, including sales tax you pay: shingles, underlayment, starter, ridge cap and nails
  • Other materials: a lump for drip edge, step flashing, pipe boots, vents and ice and water shield. Fixr's February 2026 guide puts ice and water shield at about $0.50 per sq ft, roughly $50 a square
  • Labor per square: your crew's cost or your sub's rate, times measured squares. A higher option can carry a higher labor rate if it takes longer to install
  • Tear-off: squares × layers × your tear-off cost, plus the dumpster or dump fees. Fixr says tearing off and disposing of an old roof averages $50 per square including dumping fees, and can reach $150 per square for heavier materials or multiple layers of asphalt shingles
  • Margin is not markup. A 25% margin means you keep 25 cents of every dollar of price, which takes a 33.3% markup on cost (0.25 ÷ 0.75). Adding 25% to cost only gets you a 20% margin. The profit margin calculator checks the math

Change one or two things per step. A common ladder keeps the same shingle and adds ice and water shield and a ridge vent for Better, then moves to a heavier shingle line with a longer workmanship warranty for Best. ServiceTitan's roofing proposal page notes that templates can offer tiered options built on different shingles, such as designer, high-definition and 3-tab.

Key Takeaways

  • Order on measured squares plus waste; pay labor on measured squares
  • Tear-off is priced per square, per layer, plus disposal
  • A 25% margin needs a 33.3% markup, not 25%

Worked Example: 20-Square Re-Roof, Three Options

Here is a full three-option proposal for a 20-square (2,000 sq ft) 6/12 gable roof with one layer of old 3-tab to tear off. The 10% waste allowance, $30 a square tear-off, $475 dumpster, $250 permit, 25% target margin and the per-square material and labor figures are example inputs for the math. Use your supplier's quote and your own crew's cost.

Shared by all three: 20 × 1.10 = 22 squares ordered. Tear-off 20 squares × 1 layer × $30 = $600, plus the $475 dumpster and $250 permit = $1,325.

Line Good Better Best
SystemArchitectural shingle, synthetic underlayment, existing vents reusedSame shingle, ice and water shield at eaves and valleys, new ridge ventHeavier architectural line, ice and water at eaves and valleys, ridge vent, new step flashing
Materials per square × 22$160 = $3,520$190 = $4,180$210 = $4,620
Other materials (drip edge, flashing, boots, vents, ice and water)$450$950$1,200
Labor per square × 20$150 = $3,000$150 = $3,000$160 = $3,200
Tear-off, dumpster, permit$1,325$1,325$1,325
Your cost$8,295$9,455$10,345
Cost ÷ 0.75$11,060.00$12,606.67$13,793.33
Price (rounded up)$11,060$12,607$13,794
Per sq ft of roof$5.53$6.30$6.90
You keep$2,765$3,152$3,449

Each "you keep" figure is 25% of its price ($2,765 ÷ $11,060, $3,152 ÷ $12,607 and $3,449 ÷ $13,794). Below the options go the unit prices for hidden damage, $95 per 4x8 sheet of decking and $14 per foot of fascia, and two add-ons for the client to initial. If the crew finds 4 rotted sheets on the Better roof, that is 4 × $95 = $380, approved before the work, for a new total of $12,987. The $95 and $14 are example unit prices; set your own from your cost per sheet and per foot.

Deposit check for a California job: 10% of each option is $1,106.00, $1,260.70 and $1,379.40, so all three hit the $1,000 cap described below and the deposit is $1,000 on any option the client picks.

Sanity check: Fixr's February 2026 guide puts the average roof replacement at about $10,000, with most projects between $7,500 and $14,000, and its roof-size table puts a 2,000 sq ft roof at $7,500 to $22,000. All three options land inside both ranges. Prices vary by region, so check your own market and get a current supplier quote before you send it. The roof replacement cost calculator gives a quick range by material.

Key Takeaways

  • Good $11,060, Better $12,607, Best $13,794 at a 25% margin
  • 22 squares ordered for 20 measured at 10% waste
  • Decking found after tear-off: $95 a sheet, approved first

Rotted Decking, Hidden Layers and Change Orders

You cannot see the deck until the old roof is off, so price the surprise before you start. I'm a remodeler, not a roofer, but I've been burned by hidden work on my own jobs: rot, old plumbing and structural problems nobody knew about until the walls came open. In the Pacific Northwest, where I work, water damage is the number one thing I find. A roof is the same problem from the top side.

  • Put a per-sheet decking price on the proposal. JobNimbus recommends a rotten wood or sheathing replacement fee per sheet and a flat rate per linear foot of fascia board. Fixr's guide puts replacing roof decking at $2 to $8 per sq ft, which is about $64 to $256 for a 32 sq ft sheet
  • Say how many layers you are pricing. If you find a second layer under the first, it is more labor and more weight in the dumpster. An "extra hidden layer, per square" unit price covers it
  • Get the OK before the work. JobNimbus says to get a signed revision before performing extra work. Take photos of the damage, show the homeowner, write the count and the total, and get a signature or a written yes
  • Roofing over an existing layer: check your local code and your permit office before you offer a recover over the old shingles instead of a tear-off

This is the same reason I tell homeowners to compare bids apples to apples. A bid that leaves out decking, flashing or the number of layers looks cheaper on the kitchen table and costs more by the end of the job.

Key Takeaways

  • Decking per sheet and fascia per foot go on the proposal
  • Price the number of layers you are tearing off, and a rate for extras
  • Photos and a signed OK before any extra work

Warranties, Deposit and Expiry

Write two warranties on every option, and keep them apart. The manufacturer's warranty covers the materials on the maker's terms. Your workmanship warranty covers your installation, and it is a tier lever you control. JobNimbus gives examples like a 5-year, 10-year or lifetime labor guarantee.

  • Manufacturer warranty: name it exactly as the manufacturer's paperwork does, and only list an upgraded system warranty if you are eligible to offer it and the option uses the accessories it requires
  • Workmanship warranty: length, what it covers (leaks from your installation) and what it does not (storm damage, other trades' work). The example above could run 2 years on Good, 5 on Better and 10 on Best
  • Deposit: check your state's rules. California's contractor board says a home improvement down payment cannot be more than $1,000 or 10% of the contract price, whichever is less, and later payments cannot run ahead of the work done or materials delivered. On the $12,607 Better roof, 10% would be $1,260.70, so the California cap is $1,000. JobNimbus's example of 33% upfront, 33% on material delivery and 33% at completion would not pass as a California down payment
  • Expiry: material prices move. JobNimbus says most roofing proposals expire within 30 days of issuance, and the template defaults to 30 days
  • Weather: give a schedule window, not a date, and say the start moves with rain or wind

Key Takeaways

  • Manufacturer and workmanship warranties are separate lines
  • California caps the down payment at $1,000 or 10%, whichever is less
  • Most roofing proposals expire within 30 days

Send It, Then Follow Up

Most contractors send a bid and never chase it, so the one who follows up stands out. A lot of jobs are won on the second or third follow-up, not the first send. On the follow-up, ask which option they are leaning toward. A homeowner stuck between Better and Best wants a different conversation than one who has not opened the proposal yet. If they say another roofer came in lower, ask whether that bid lists the layers coming off, ice and water shield, flashing and a price per sheet for rotted decking. A lower number that leaves those out is not the same roof.

If you would rather not build proposals by hand, EstimationPro builds Good-Better-Best estimates from photos, a voice walkthrough or typed notes, with labor and material rates adjusted for your region, and you review every line before it goes out. Send it from EstimationPro and the client gets an automatic reminder at 24 hours if they have not opened it, another 48 hours after they open it with no response, and a final one at 7 days. I use that follow-up on my own jobs. One estimate is $9, or plans run $79 or $149 a month. It is not a dispatch or crew-routing platform, and it does not order materials.

Key Takeaways

  • Jobs are often won on the second or third follow-up
  • Ask which option they are leaning toward
  • Automatic reminders only run on estimates sent from EstimationPro

How to Use This Calculator

Fill In the Roof and What You Found

Enter your company, license and insurance, the client and job address, the roof style and pitch, the existing roofing and its age, and what you found and recommend in plain words.

Enter Measurements and Your Costs

Type the measured squares, your waste allowance, the layers to tear off and your tear-off cost per square, the dumpster and permit, and the margin you want to keep. The template shows the squares to order and the markup that matches your margin. The client never sees these numbers.

Build Up to Three Roof Options

For Good, Better and Best, describe the shingle, underlayment, what else is included and both warranties, then enter materials per square, other materials and labor per square at your cost. The template suggests each price from (cost ÷ (1 − margin)), rounded up, and shows the price per sq ft and what you keep. Type your own price to override it.

Add Unit Prices, Terms, Preview and Print

Set the price per sheet of decking, per foot of fascia and per square for an extra hidden layer. Add optional add-ons for the client to initial, edit what is and is not included, and set the schedule, deposit and how long prices are good for. Preview shows the options side by side with a check-one box and signature lines. Print it or save it as a PDF, or print the blank version for the roof inspection.

Free to Embed on Your Website

Add this calculator to your blog, resource page, or client portal — just copy one line of code. Your visitors get a useful tool, you get more engagement.

100% freeAuto-resizesMobile responsiveNo sign-up required
EstimationPro AI For Contractors, By Contractors

Go Beyond Templates With AI-Powered Estimates

Templates are a start. EstimationPro generates complete, customized estimates from your project details.

Photos & voice to estimate PDF proposals & schedules Regional pricing data
Price one real job for $9. 30-day money-back guarantee. Automatic client follow-up Built by a contractor who uses it on his own remodeling jobs

Frequently Asked Questions

What should a roofing proposal include?

Your company, license and insurance, the client and job address, what you found (roof style, pitch, measured squares, existing roofing and layers, damage), one to three roof options with shingle, underlayment, ice and water shield, ventilation, manufacturer and workmanship warranties and one price each, what every option includes, unit prices for decking and fascia found after tear-off, optional add-ons, what is not included, the schedule, deposit and payment terms, how long the prices are good for, and a signature block where the client checks one option.

How do I price a roof per square on a proposal?

Multiply the squares you order (measured squares plus waste) by your materials per square, add the other materials, multiply the measured squares by your labor per square, and add tear-off, disposal and the permit. Then divide by (1 minus your target margin). In the worked example, a $9,455 cost at a 25% margin is $9,455 ÷ 0.75 = $12,606.67, rounded up to $12,607. A 25% margin takes a 33.3% markup; adding 25% to cost only gets you a 20% margin. The profit margin calculator checks the math.

How do I handle rotted decking on a roofing proposal?

Put a unit price on the proposal before you start: a price per 4x8 sheet of decking and per linear foot of fascia. Fixr puts what homeowners pay to replace roof decking at $2 to $8 per sq ft, about $64 to $256 a sheet, so a per-sheet price inside that range is easy to explain. When the crew finds bad wood, photograph it, show the homeowner, write the count and total, and get their OK before the repair. In the worked example the unit price is $95 a sheet (an example input; set yours from your own cost), so four sheets is $380, agreed on the spot instead of argued over at the final payment.

How big a deposit can I ask for on a roofing job?

It depends on your state. In California, the Contractors State License Board says a home improvement down payment cannot be more than $1,000 or 10% of the contract price, whichever is less. On a $12,607 roof that is $1,000, not $1,260.70. Check your own state's contractor rules before you set the deposit in the template.

How long should a roofing proposal be valid?

JobNimbus says most roofing proposals expire within 30 days of issuance, and the template defaults to 30 days. Shingle and accessory prices move, so a clear expiry date protects your margin if the homeowner signs months later.

Related Tools and Articles

Sources

What EstimationPro Does for Contractors

Photos, Voice or Notes In

Describe the job with photos, a voice walkthrough or typed notes and get priced line items for labor and materials. Contractors save 2+ hours per estimate.

Priced for Your Area

Labor and material rates are adjusted for the job's location. You review and edit every line before it goes out.

Automatic Follow-Up

Send the estimate from EstimationPro and your client gets a reminder at 24 hours, 48 hours and 7 days. Many jobs are won on the second or third follow-up.

PDF, Link and Payments

Export a PDF or share a link your client can approve. Collect payments online with Stripe; deposits, milestone schedules and invoices are on Pro.

Related Free Tools

Estimating software for roofing contractors

Photos, voice or notes in, a priced estimate out.

Try EstimationPro AI

Turn this job into a full, priced estimate for your client.

Snap photos, talk through the scope, drop in your notes. The AI prices every line item with labor and material rates adjusted for your region, and checks the math.

30-day money-back guarantee Automatic client follow-up Built by a 20-year contractor
Get started Price one real job for $9. 30-day money-back guarantee.
Go beyond templates with AI estimates